Doctoral Research

Sensor-Guided Same-Layer Repair of Material-Loss Gaps

Completed physical experiments connecting laser-measured gap geometry with grey-box and residual-informed planning for localized same-layer repair in robotic construction 3D printing.

Laser sensingSame-layer repairGrey-box modelingResidual-informed planning
Robotic mortar deposition repairing two measured material-loss gaps
Sensor-Guided Double-Gap Repair

From measured gaps to localized repair

Material interruptions during robotic construction 3D printing can leave gaps in an already deposited layer. This research localizes those material-loss regions from measured geometry, returns the robot to the affected locations, and deposits material within the same layer. Post-repair laser measurements verify the geometric response.

Sensing and repair planning

Laser profiles describe deposited geometry and distinguish genuine material-loss regions from invalid scanner observations. The measured gaps define where localized repair is needed. The RGB camera documents the experiments; geometric feedback comes from the laser scanner.

Grey-Box Repair uses a semi-empirical deposition model and constrained inverse command selection to relate material delivery, robot travel, and material age to the requested deposition.

Grey-Box + Residual-Informed Repair adds an offline-trained spatial ridge-residual correction to guide the deposition request. Its coefficients remain frozen during execution. This strategy was implemented and evaluated in physical single-gap and double-gap repairs; it does not use reinforcement learning.

The physical evaluation includes single- and double-gap repair. Repair does not imply complete gap filling or elimination of overfill. Experimental conditions differ, so observed improvements cannot be attributed solely to residual learning.

Research workflow

  1. Robotic material deposition — Deposit the mortar layer.
  2. Laser-based geometric measurement — Measure the deposited geometry.
  3. Material-loss gap localization — Identify the regions requiring repair.
  4. Grey-box and residual-informed repair planning — Select feasible, spatially targeted repair commands.
  5. Same-layer repair execution and geometric verification — Repair the measured gaps and re-scan the layer.

Manuscript Under Review

Sensor-Guided Same-Layer Repair of Material-Loss Gaps in Robotic Construction 3D Printing

Muhammad Arslan, Abdul Wahid Mangi, Vedhus Hoskere.

Automation in Construction · Elsevier.

RESEARCH IN VIEW

Sensor-Guided Same-Layer Repair

Single-gap and double-gap repairs were physically executed on the printed mortar layer using grey-box and residual-informed planning.

Experimental demonstrations

Single-Gap Repair

Sensor-guided material deposition within a measured single-gap region using grey-box and residual-informed repair planning.8× speed

Double-Gap Repair

Localized material deposition within two separate measured gap regions using residual-informed repair planning.8× speed

Experimental Results

Selected experiments using Grey-Box + Residual-Informed Repair showed more complete material filling than the selected Grey-Box Repair experiments.

The experiments demonstrate improved filling of measured material-loss gaps. Local excess deposition can remain, and the geometric observations do not establish structural-strength recovery. The strategies used different specimens and operating conditions, so the photographs alone do not isolate the causal effect of residual learning.

Single-Gap Repair — Grey-Box Model

Single-gap mortar specimen before grey-box repair
Before Repair
Single-gap mortar specimen after grey-box repair
After Repair

Single-Gap Repair — Grey-Box + Residual Correction

Single-gap mortar specimen before grey-box plus residual-informed repair
Before Repair
Single-gap mortar specimen after grey-box plus residual-informed repair
After Repair

Double-Gap Repair — Grey-Box Model

Double-gap mortar specimen before grey-box repair
Before Repair
Double-gap mortar specimen after grey-box repair
After Repair

Double-Gap Repair — Grey-Box + Residual Correction

Double-gap mortar specimen before grey-box plus residual-informed repair
Before Repair
Double-gap mortar specimen after grey-box plus residual-informed repair
After Repair